The stages of mine design

Below is a generalised list about the stages of mine design. When you start to look at a mining company and their stock remember the list below. As a general rule you will find that the share price will creep from the initial opening of the stock to the Pre-Fesibility Study, it will then drop sharply and regain some ground a the detailed design phase. Once that is complete and if it is a sound project the price should increase dramatically. 
  • Pre-evaluation study
  • Scoping study
  • Pre-feasibility study
  • Feasibility study
  • Detailed design
  • Project management principles